CD Restop
Technology & Infrastructure

Technology & Infrastructure

Advanced technology systems powering the next generation of rest stop infrastructure

160 – 240 kW
EVIA DC Fast Charge
CCS2
EU Standard
GB/T
CN Standard
CHAdeMO
JP Standard
2 Súng DC
Sạc đồng thời
IP54
Ngoài trời
≥ 94%
Hiệu suất
EVIA ZDDC160BG · DC Fast Charger 160-240kW
EVIA Global Green × CD Restop

DC 160KW charger — ZDDC160BG

Dual-gun 160KW DC charger — strategic partner EVIA Global Green provides next-generation fast-charging for the CD Restop ecosystem

EVIA ZDDC160BG 160KW DC Charger

EVIA ZDDC160BG

Dual-gun 160KW DC charger

160KWDC Fast2 SúngIP54
EVIA × CD RESTOP charging station in real deployment
EVIA × CD RESTOP charging station — real deployment
📋
ZDDC160BG
EVIA Product Code
160KW (max 240KW)
Rated / Max power output
🔌
DC200-1000V
Output voltage range
250A × 2
Output current (2 guns)
🔗
2 ports GB/T 20234.3
2 DC ports, national standard
📊
Efficiency ≥ 94%
Energy conversion efficiency
📐
1770 × 959 × 572mm
Dimensions (L×W×H)
🛡️
IP54 — Indoor/Outdoor
Dust & water protection
🌡️
-20°C ~ +50°C
Operating temperature
🖥️
7-inch LCD touch
Display and operation screen
🌐
Ethernet / 4G
CSMS cloud connection
💳
Card reader (optional)
Card/RFID payment
🌀
Forced air cooling
Efficient cooling system
⛈️
Surge protection
Lightning & surge protection
CD Restop × Partners · Partnership Program

Partner to open EVIA charging stations
160 – 240 kW · 25–30% profit/month

CD Restop deploys EVIA fast chargers — pioneering equipment in Vietnam, compatible with every EV brand. Partners only provide the site — CD Restop handles the full package: design, installation, operation.

60 m²
Site / charger
160–240
kW power
5 years
Contract term
25–30%
Partner profit
🏢
Party A — Invest & operate

CD RESTOP

  • On-site survey & design
  • Supply EVIA chargers + supervise installation
  • Pay monthly electricity bills
  • Pay partner profit monthly
  • Maintenance, servicing & charger insurance
  • Provide the app for automatic billing
  • Install AI surveillance cameras
  • Set unit pricing per Party A policy
  • Full 24/7 operation of the system
  • Provide branding kit & signage
10 responsibilities · Full investment
🤝
Party B — Site partner

Partner

  • Provide ~60m² site for one charger
  • Provide site information for the survey
  • Provide proof of use rights / lease contract
  • Sign a 5-year contract
  • Complete electricity-trading license + fire-safety equipment
  • Provide sufficient 160kW or 240kW power supply
  • Pour the base & run power to the charger base
  • Provide internet for surveillance cameras
  • Responsible for signage and canopy
9 responsibilities · Just the site
💰 Profit-sharing ratio

After deducting actual electricity cost

Scale more chargers → higher partner share

1-charger package
1 Station
🔌
CD RESTOP (Party A)75%
Partner (Party B)25%
⭐ Offer
2-charger package
2 Stations
🔌🔌
CD RESTOP (Party A)70%
Partner (Party B) ↑30%
💡 +1 charger → +5% profit for the partner
📊 Tax note: Party B bears its own corporate income tax (CIT) on its revenue share in accordance with Vietnamese law.
🛣️ 5-step process

From registration to operation

Total time: ~20 days from first contact to first profit

01
📋

Register

Contact hotline / online form

1 day
02
📐

Survey

CD Restop survey + design

3–5 days
03
📝

Sign contract

5-year term, VNPT CA eSign

1 day
04
🔌

Install

Deliver EVIA charger + commissioning

10–15 days
05
💰

Operate

Collect monthly profit

Monthly
🤝

Have a site? We have the solution

Just 60m² of space that fits, and CD Restop will survey and deploy an EVIA station within 20 days. Contact us now for a free consultation.

✓ Free consultation✓ No CAPEX required✓ Monthly profit✓ 24/7 support
🏗️ Real gallery

EV charging station design

Real photos of EV charging station design and deployment by CD Restop

Trạm sạc EVIA × CD RESTOP — Thiết kế thi công thực tế
Trạm sạc EVIA × CD RESTOP — Thiết kế thi công thực tế
Trạm sạc EV #1
Trạm sạc EV #1
Trạm sạc EVIA tại điểm dừng chân — Hạ tầng sạc nhanh DC
Trạm sạc EVIA tại điểm dừng chân — Hạ tầng sạc nhanh DC
Trạm sạc EV #2
Trạm sạc EV #2
Trạm sạc EV #3
Trạm sạc EV #3
Trạm sạc EV #4
Trạm sạc EV #4
🖥️ CSMS Platform

CSMS Management System

Smart charging-station management platform with integrated payments and real-time operations reporting

Smart Charging

Dynamic load balancing, optimized energy costs

📊

Real-time Monitor

Live 24/7 operations dashboard

💳

Integrated Payment

Supports QR, cards, e-wallets and multiple platforms

🌿 Green Energy

Renewable Energy

Integrated renewable energy for power autonomy, lower operating costs and carbon emissions

☀️

Solar Energy

Solar panels integrated on the station roof

🔋

Energy Storage

A BESS for voltage stabilization and backup

🔄

Continuous Supply

Guaranteed 24/7 charging even during grid outages

📱 Mobile App

Restop Charging App

An app to book charging, pay and connect services on a single platform

📍

Find Station

Real-time map, filterable by connector type

💳

Quick Pay

QR code, e-wallet, personal cost analytics

🍽️

Book Services

Order F&B, shopping and services at the station

✨ Smart Station

Community Utilities & Digital Technology

Digital utilities that turn charging stations into smart destinations and boost ancillary revenue

📺

LED Advertising

Integrated commercial LED screens at the station

📶

Free WiFi

High-speed WiFi coverage for customers

📷

AI Camera

Security surveillance and vehicle recognition

🚀

Interested in our technology?

Contact us to learn more about the EVIA charging ecosystem, the CSMS platform and CD Restop’s smart operations solutions.