CD RESTOP Social Infrastructure Investment JSC
A developer and builder of welfare infrastructure in Vietnam
«Digital transformation meets green transformation — caring for Vietnamese workers»
Ver17 · 19/09/2026 · 42 pages · PDF
Scharge Project network targets — goals, not current status.
9 and 11 September 2026
Four documents · ten signing parties · Ky Hoa Ben Thanh Hotel, Ho Chi Minh City

- Round 1 · Chapter I — Scharge platform
Strategic cooperation agreement — Scharge Project
SPT Group · CD Restop · DTH Holdings · Coro Energy
- Round 2 · Chapter II — Network
MoU on the supply of charging-station equipment
SPT Group × XECO — witnessed by CD Restop
- Round 3 · Chapter II — Network
MoU on jointly developing welfare rest stops
CD Restop · Nong Lam Phu Chau · Chao Holding · DBMC · Giang Son Viet
- Round 4 · Chapter III — Digital city
MoU on developing digital-transformation platforms
SPT Group × Smartsys (a DTH Holdings member) — witnessed by CD Restop

Strategic Technology Cup — Energy technology and advanced materials
CD RESTOP was one of the companies honoured, two days after the signing ceremony.
Company overview
Vision – Mission – Core values
Vision
CD RESTOP is building a standardised network of welfare rest stops and charging stations across 34 provinces and cities: where digital transformation meets green transformation, and welfare is the core of every stop — not an add-on.
Mission
Caring for Vietnamese workers through the "5 Haves" standard at every stop — funded by the stop's own revenue, with no request for public financial support. What we commit to, we deliver — and we measure.
The "5 Haves" standard
- 1Clean energy
- 2Meals and essentials at welfare prices
- 3Safe digital financial services
- 4Community activities
- 5Traveller welfare
Safety
Highest safety standards for every service on site
Sustainability
Green design, solar power and storage, lower emissions
Connection
Linking journeys, communities and digital ecosystems
Welfare
Local jobs, support for local businesses and farm produce
The CD RESTOP ecosystem
Six service lines on one site, sharing the power supply, metering system and a single set of operating standards — the precondition for replication.
RESTOP
Four standardised rest-stop classes
EV Charging
DC/AC chargers for all vehicle makes
GOMO Mart
Mini-mart, dining and local farm produce
Advertising
On-site LED billboards and digital screens
Welfare
Free rest areas, community activities, jobs
Green energy
Solar power combined with energy storage (BESS)
The RESTOP model — design standards
Multi-service rest stops, standardised for replication.
Under 500 m² to 5,000 m² by stop class
Highway corridors, city gateways, industrial parks
500 – 2,000 vehicles per day
QCVN 43:2024 · fire protection · food safety
Accessible design for people with disabilities at every class
IoT · AI cameras · operations and reconciliation
On-site solar with storage and the national grid
"5 Haves" applied from largest to affiliated stops
The 2024 Road Law requires rest stops to have charging systems.
Four classes of CD RESTOP rest stops
A four-tier standard — optimising rollout speed and capital cost per stop.
COMPLEX
International ports, transport hubs, key national interchanges — logistics & fulfillment, lodging, large restaurant, specialty livestream studio.
Class A
Key national or regional transport hub — F&B and relaxation lounge, driver health recovery, trade-union space.
Class B
Urban gateways, major inner-outer junctions — core EV charging station, coffee, fast food, GOMO Mart at stable prices.
Class C
On partners' existing premises — linking existing service sites, DC/AC chargers, solar power; still meets all "5 Haves". Not a mini-mart format.
Class areas are the design standard set out in the company profile; each site is sized individually.
Leadership team
A founding and executive team with cross-sector experience — each role owns a defined block of work.

Annie Nguyen
Sets the network's development strategy and approves investment policy; represents the company with shareholders, investors and strategic partners.

Nguyen Ngoc Hai
Runs the whole of the company: land pipeline, partnership negotiations, delivery of each site, and accountability for the network's commercial results.

Ha Tuan Khang
Builds the operating technology platform, the site management system and the customer app; owns brand identity, content and digital communications.

Giap Thien Phuc
Focal point for investors, funds and accompanying partners; prepares fundraising materials, structures partnerships and tracks commitments per project.

Nguyen Hoang Quoc Huy
Advises on communications strategy and press relations; shapes external messaging, runs events and joint programmes with local authorities.

Dang Thi Thuy Van
Leads finance and accounting, capital planning and the operating budget; controls cash flow, investment cost and the economics of each site.
Download the full 2026 Company Profile
42 pages: milestones, the four-class model, driver amenities, technical standards, roadmap, partners and ESG — three equivalent editions in Vietnamese, English and Chinese.
Source: CD RESTOP Company Profile 2026, Ver17 (19/09/2026). Network figures are Scharge Project targets; renderings are proposed designs.
