Rest-stop models by tier A · B · C · Complex

CD Restop standardizes rest-stops into 4 tiers by size and location — each with a role, one 5-star operating standard, DC fast-charging and host revenue-share.

⚙️ Shared design standard

One operating standard for all tiers

📐

Area 500 – 20,000 m² by scale

📍

Spaced 60 – 100 km on highways

🚗

Serves 500 – 2,000 vehicles/day

DC fast-charge + solar

🤖

IoT, AI cameras, smart ops

🏗️

MoT standard · green design

COMPLEX

Area
3,000 – 5,000 m²
Typical location
Int’l ports · transport hubs · national interchanges
Chargers
Large DC cluster + AC
Integrated services
Logistics & fulfillment (dry/cold), lodging & large F&B, driver mini-hotel, livestream studio — 50+ jobs/site
Investment model
Complex — large capex
Reference project
RESTOP Ho Tram · RESTOP Phu My
A

TIER A · Anchor

Area
1,500 – 3,000 m²
Typical location
Key national / regional transport centers
Chargers
08 DC chargers (DC/AC)
Integrated services
5-star F&B · driver recovery · union & welfare space · GOMO Mart
Investment model
High capex
Reference project
RESTOP Cienco 68 · 4,658 m² · in progress
B

TIER B · Branch

Area
500 – 1,500 m²
Typical location
Urban gateways · major interchanges
Chargers
06 DC chargers · 60–150 kW
Integrated services
EV charging (focus) · café & fast food · medium GOMO Mart · CD Go shuttle
Investment model
Medium capex
Reference project
RESTOP Tier B · Q3/2026
C

TIER C · Affiliate

Area
Affiliate · ~300–500 m²
Typical location
Existing service points: gas / eatery / parking
Chargers
01–02 DC/AC chargers · 120–160 kW
Integrated services
Chargers + solar at host point · mini-mart · community board
Investment model
CD Restop funds 100% (chargers + solar) · host share 25% (1) / 30% (2 chargers)
Reference project
Hi-Tech Park canteen · expanding
📋 Evaluation framework

6 groups of site-evaluation criteria

Every site is scored against 6 criteria groups; thresholds vary by model.

1

📍 Location & traffic

Route type, vehicles/day, frontage & access.

2

📐 Area & shape

Large enough, regular shape, fits design modules.

3

Power & charging

Available capacity, distance to substation.

4

📄 Land legal status

Title, compatible zoning, no disputes.

5

👥 Population & competition

Demand nearby, competition within 5 km.

6

🛡️ Safety & expansion

Security, fire safety; solar / F&B / ad potential.

🧭 Process

Partnership & model-selection process

CD Restop surveys, recommends the right model and accompanies the landowner through to operation.

1

Receive land proposal

2

Initial review & model suggestion

3

Field survey & scoring

4

Confirm model & plan

5

Legal & technical due diligence

6

Negotiate & sign contract

7

Design – Build – Operate

🤝 Have suitable land?

Develop a rest-stop with CD Restop