Rest-stop models by tier A · B · C · Complex
CD Restop standardizes rest-stops into 4 tiers by size and location — each with a role, one 5-star operating standard, DC fast-charging and host revenue-share.
One operating standard for all tiers
Area 500 – 20,000 m² by scale
Spaced 60 – 100 km on highways
Serves 500 – 2,000 vehicles/day
DC fast-charge + solar
IoT, AI cameras, smart ops
MoT standard · green design
COMPLEX
- Area
- 3,000 – 5,000 m²
- Typical location
- Int’l ports · transport hubs · national interchanges
- Chargers
- Large DC cluster + AC
- Integrated services
- Logistics & fulfillment (dry/cold), lodging & large F&B, driver mini-hotel, livestream studio — 50+ jobs/site
- Investment model
- Complex — large capex
- Reference project
- RESTOP Ho Tram · RESTOP Phu My
TIER A · Anchor
- Area
- 1,500 – 3,000 m²
- Typical location
- Key national / regional transport centers
- Chargers
- 08 DC chargers (DC/AC)
- Integrated services
- 5-star F&B · driver recovery · union & welfare space · GOMO Mart
- Investment model
- High capex
- Reference project
- RESTOP Cienco 68 · 4,658 m² · in progress
TIER B · Branch
- Area
- 500 – 1,500 m²
- Typical location
- Urban gateways · major interchanges
- Chargers
- 06 DC chargers · 60–150 kW
- Integrated services
- EV charging (focus) · café & fast food · medium GOMO Mart · CD Go shuttle
- Investment model
- Medium capex
- Reference project
- RESTOP Tier B · Q3/2026
TIER C · Affiliate
- Area
- Affiliate · ~300–500 m²
- Typical location
- Existing service points: gas / eatery / parking
- Chargers
- 01–02 DC/AC chargers · 120–160 kW
- Integrated services
- Chargers + solar at host point · mini-mart · community board
- Investment model
- CD Restop funds 100% (chargers + solar) · host share 25% (1) / 30% (2 chargers)
- Reference project
- Hi-Tech Park canteen · expanding
6 groups of site-evaluation criteria
Every site is scored against 6 criteria groups; thresholds vary by model.
📍 Location & traffic
Route type, vehicles/day, frontage & access.
📐 Area & shape
Large enough, regular shape, fits design modules.
⚡ Power & charging
Available capacity, distance to substation.
📄 Land legal status
Title, compatible zoning, no disputes.
👥 Population & competition
Demand nearby, competition within 5 km.
🛡️ Safety & expansion
Security, fire safety; solar / F&B / ad potential.
Partnership & model-selection process
CD Restop surveys, recommends the right model and accompanies the landowner through to operation.
Receive land proposal
Initial review & model suggestion
Field survey & scoring
Confirm model & plan
Legal & technical due diligence
Negotiate & sign contract
Design – Build – Operate