Skip to content
CD Restop
🏪 4 model tiers · 1 operating standard

Rest-stop models by tier A · B · C · Complex

CD Restop standardizes rest-stops into 4 tiers by size and location — each with a role, one operating standard, DC fast-charging and host revenue-share.

Overall rendering of a CD Restop rest-stop
Proposed renderings, not construction drawings.
⚙️ Shared design standard

One operating standard for all tiers

📐

Area 500 – 5,000 m² by scale

📍

Spaced 60 – 100 km on highways

🚗

Serves 500 – 2,000 vehicles/day

⚡

DC fast-charge + solar

🤖

IoT, AI cameras, smart ops

🏗️

MoT standard · green design

Model rendering COMPLEX
★

COMPLEX

Area
3,000 – 5,000 m²
Typical location
Int’l ports · transport hubs · national interchanges
Chargers
Large DC cluster + AC
Integrated services
Logistics & fulfillment (dry/cold), lodging & large F&B, driver mini-hotel, livestream studio
Investment model
Complex — large capex
Reference project
RESTOP Ho Tram · RESTOP Phu My
Model rendering TIER A · Anchor
A

TIER A · Anchor

Area
1,500 – 3,000 m²
Typical location
Key national / regional transport centers
Chargers
08 DC chargers (DC/AC)
Integrated services
F&B and relaxation lounge · driver recovery · union & welfare space · GOMO Mart
Investment model
High capex
Reference project
RESTOP Cienco 68 · 4,658 m² · in progress
Model rendering TIER B · Branch
B

TIER B · Branch

Area
500 – 1,500 m²
Typical location
Urban gateways · major interchanges
Chargers
06 DC chargers · 60–150 kW
Integrated services
EV charging (focus) · café & fast food · medium GOMO Mart · CD Go shuttle
Investment model
Medium capex
Reference project
Seeking suitable sites
Model rendering TIER C · Affiliate
C

TIER C · Affiliate

Area
Affiliate · ~300–500 m²
Typical location
Existing service points: gas / eatery / parking
Chargers
01–02 DC/AC chargers · 120–160 kW
Integrated services
Chargers + solar at host point · smart vending · community board
Investment model
CD Restop funds the chargers and solar · host share by agreement
Reference project
Hi-Tech Park canteen · expanding

Tier areas and the spacing between stops come from the CD Restop design standard; they are not part of the documents signed on 9 September 2026.

📸 Service renderings

Inside a rest-stop

Rest-stop overview

Rest-stop overview

Solar canopy, dedicated charging lanes and an adjacent service block.

Fast-charging lane

Fast-charging lane

A Scharge charger serving two vehicles at once, right by the amenities.

Dining area

Dining area

Affordable meals for drivers and passengers while charging.

Convenience store

Convenience store

Gomo combo mart with essentials and regional specialties.

❤️ Driver welfare

Welfare amenities for drivers

Rest berths, showers, laundry and lockers — designed for long-haul drivers breaking mid-route.

Driver rest room

Driver rest room

A 32 m² layout with 12 private sleeping berths, curtains and per-berth reading lights.

Bunk cluster

Bunk cluster

Each berth has a socket, a shelf and its own ventilation.

Shower · laundry · lockers

Shower · laundry · lockers

A separate 80 m² block: 4 shower cabins, 6 washers and 6 dryers, 24 lockers.

Laundry

Laundry

Long-haul drivers can wash and dry during a mid-route break.

Proposed renderings, not construction drawings.

📋 Evaluation framework

6 groups of site-evaluation criteria

Every site is scored against 6 criteria groups; thresholds vary by model.

1

📍 Location & traffic

Route type, vehicles/day, frontage & access.

2

📐 Area & shape

Large enough, regular shape, fits design modules.

3

⚡ Power & charging

Available capacity, distance to substation.

4

📄 Land legal status

Title, compatible zoning, no disputes.

5

👥 Population & competition

Demand nearby, competition within 5 km.

6

🛡️ Safety & expansion

Security, fire safety; solar / F&B / ad potential.

🧭 Process

Partnership & model-selection process

CD Restop surveys, recommends the right model and accompanies the landowner through to operation.

1

Receive land proposal

2

Initial review & model suggestion

3

Field survey & scoring

4

Confirm model & plan

5

Legal & technical due diligence

6

Negotiate & sign contract

7

Design – Build – Operate

🤝 Have suitable land?

Develop a rest-stop with CD Restop