Skip to content
CD Restop
CD GO · Charging Infrastructure

Dedicated charging for your fleet —
typically deployed in 30–60 days

CD GO invests in dedicated charging stations at the request of our operator partners. You bring the site or the route — we take care of the equipment, grid connection and operation. Available bundled with a vehicle lease or as a standalone investment.

NOT a public charging network

CD GO does not compete with V-Green, EV One or other public charging networks. We only invest in dedicated charging stations at the request of our operator partners, tied to a lease or revenue-sharing agreement. This approach helps raise utilization, shorten the payback period and avoid the cash-burning race to build out a network.

3 charging station models

Each model serves a different operating pattern

🏢
DEPOT

Depot Charging

Charging stations at the operator partner’s depot — overnight charging

Located at
Operator partner depots (industrial parks, taxi garages, logistics depots)
Typical use cases
Taxis, overnight logistics charging, corporate fleets
Recommended power
AC 22kW / DC 60–120kW × 10–30 chargers
🛣️
ROUTE

Route Charging

Stations along fixed routes (shuttles, coaches)

Located at
Airport routes, intercity routes, industrial parks
Typical use cases
Tourist coaches, resort shuttles, interprovincial routes
Recommended power
DC 180–240kW × 2–6 chargers
🏨
CUSTOMER_SITE

Customer-Site Charging

Stations at the operator partner’s end customers

Located at
Resorts, industrial parks, malls, hospitals
Typical use cases
Resort shuttles, industrial park transfers, valet
Recommended power
AC 22kW / DC 60kW × 4–10 chargers

Charging technology

4 charging levels · OCPP 2.0 open standard · standards-compliant equipment

AC wallbox
7–22 kW
Slow overnight charging
Suggested equipment
OCPP-compliant equipment
Best for
Overnight depot charging, MPV/sedan
DC fast
60–180 kW
Mid-shift charging
Suggested equipment
OCPP-compliant equipment
Best for
Mid-shift taxis, logistics vans
DC ultra-fast
240–480 kW
Ultra-fast charging
Suggested equipment
Standards-compliant high-power equipment
Best for
Coaches, trucks, long-haul routes
Battery swap
N/A
Battery swapping (future)
Suggested equipment
Battery swapping technology
Best for
High-volume taxis
🔌

OCPP 2.0

Open standard protocol — manage chargers from multiple brands on a single backend

📊

Real-time monitoring

Dashboard of sessions, kWh and revenue per charger per day

☀️

Solar + V2G ready

Connect solar power via a power purchase agreement (PPA) to lower cost per kWh; ready for V2G in the future

Business model — 4 revenue streams

Charging stations are more than a cost center · multiple revenue channels

🔒

Charging fees from operator partners

Operator partners lease the station exclusively and pay a fixed fee plus usage-based energy charges

Fixed + per kWh
💳

Pay-per-use

Other operators or public users pay per kWh plus a margin

kWh × margin
💰

Charging infrastructure investment partnership

Investors fund the station, CD Restop operates it, and profits are shared as agreed

As agreed
⚡

Grid services (future)

V2G and peak shaving for EVN

Contract with EVN

Deployment process

Typically 30–60 days from site survey to operation, depending on grid conditions and permitting

01

Site survey

Engineers visit the site to assess the power supply and plan charger locations

⏱ Approx. 3–5 days
02

Design

Proposed layout, capacity, load management and electrical safety

⏱ Approx. 5–7 days
03

Permitting

Work with EVN and local authorities on grid connection and construction permits

⏱ Approx. 10–20 days
04

Installation

Install chargers, transformer, cabling and OCPP firmware

⏱ Approx. 7–14 days
05

Commissioning

Charger testing, operator partner training, management system handover

⏱ Approx. 2–3 days
Package bundle

All-in-one bundle with vehicle leasing

One contract · One invoice · One SLA — covering vehicles, insurance, maintenance, charging stations, telematics and ESG reporting

🔑
Operating Lease
Fixed fee · all-inclusive
⚡
+ Charging Bundle
Depot / route / customer site
🛡️
+ EV Shield insurance
Comprehensive insurance for your fleet
View leasing details →
Investment option

Invest in charging stations

Investors can invest directly in charging stations (instead of vehicles), aiming for steady revenue from long-term power supply contracts.

View investment packages →